Case Studies

The following engagements represent a cross-section of the sectors, geographies, and operational contexts in which the methodology that helped develop the Phoenix Program has been applied by members of our team. All are presented in anonymised form at client request.

The Methodology in Practice

00
Open-pit Mining
Papua New Guinea

Ex-pit Productivity Recovery

An open-pit mining operation in Papua New Guinea, in a remote location, with a mixed owner and contractor workforce.

Multi-year Engagement
00
Open-pit Coal Mining
Indonesia

Large-scale Open-pit Coal Transformation

One of the largest open-pit coal operations in the region, running across multiple pit areas with a workforce of several thousand across shifts.

50%+ Production Uplift
00
Platinum Mining
South Africa

Production Rate Recovery

A platinum mining operation in South Africa with key production rates significantly below potential, despite capable people and functional equipment.

Operational Turnaround
00
Copper-gold Mining
Indonesia

Owner-miner to Contractor Transition

A large copper-gold mining operation in Indonesia undergoing a significant structural change: transitioning over 1,000 employees from an owner-miner to a contractor operating model.

Rapid Diagnostic to Delivery

Explore the Evidence Behind the Phoenix Program

Review the methodology and documented results behind these engagements, or speak directly with Silverwing about a comparable transformation mandate.