The following engagements represent a cross-section of the sectors, geographies, and operational contexts in which the methodology that helped develop the Phoenix Program has been applied by members of our team. All are presented in anonymised form at client request.
An open-pit mining operation in Papua New Guinea, in a remote location, with a mixed owner and contractor workforce.
One of the largest open-pit coal operations in the region, running across multiple pit areas with a workforce of several thousand across shifts.
A platinum mining operation in South Africa with key production rates significantly below potential, despite capable people and functional equipment.
A large copper-gold mining operation in Indonesia undergoing a significant structural change: transitioning over 1,000 employees from an owner-miner to a contractor operating model.
Review the methodology and documented results behind these engagements, or speak directly with Silverwing about a comparable transformation mandate.